A lower total is not necessarily a better offer. Place offers next to the same list of works and determine which prices you can compare — and which answers you still need.
One list of parts, multiple offers
Interactive input is not yet available. Reopen page.
Compare offers by scope, not just by the final number
For renovation, two offers with the same address may cover different works. For a bathroom, one may include demolition, removal, substrate preparation, and installation, while the other only tiling. This comparator does not determine what the contractor actually offers. It helps you record the same scope for all and explanations that need to be obtained before deciding.
First the comparison unit
Assign space, quantity, material, and execution to each item. “Painting” is not the same as “crack preparation and two coats on 80 m² of walls.” Enter the total amount for the described item, not the price per m² alongside another total amount.
Included is not the same as free
When work is included in the price of another item, link it to that item in the same offer. The amount is counted only once. Reference to a missing, excluded, or other included item is not allowed: otherwise, the cost could be lost in a chain of references.
Missing response, not a cost
"Not included" and "Not explained" remain open issues. With an incomplete offer, you get a known total, not an estimate of the entire renovation. Even a ten percent reserve cannot replace the unknown cost of electrical installations or substrate remediation.
Taxes and contractual conditions
For comparison, use comparable final amounts including taxes. The tool does not determine the valid tax rate, the contractor's tax status, or your rights. When considering an offer, specifically check whether taxes, removal, space protection, and finishing works are included.
How are both totals created?
The known total of an individual offer is the sum of its independently evaluated items. Included items are covered by a linked price and are not counted twice. You enter amounts to a maximum of two decimal places; we sum them in cents to prevent rounding from creating false differences. The reserve is your percentage of the known total, rounded to the cent. For a narrower comparison, we use only items that all offers evaluate independently. We do not mix package and unexplained prices into this subtotal. We also exclude the main package item if it includes other work in any offer — otherwise, we would be comparing different scopes.
Only when all offers cover the entire entered scope do we show the lowest entered total. For equal totals, all tied offers are listed. This is not a contractor recommendation: the calculation does not assess quality, deadlines, insurance, warranties, contracts, or provider reliability.
Before accepting the offer
Convert open topics into written questions: exactly what is missing, who provides the material, what is the quantity, how are additional works charged, and which dates are agreed upon. Check the validity period of the offer and payment schedule. The report retains markings of missing scope so they are not lost when sharing.
The spatial map does not confirm the permissibility of the intervention. In to the document file Check plans, consents, and required documentation separately. For the entire purchase, add the selected cost estimate to property budget, but do not count reserves twice. For questions before viewing, use preparation before purchase.
Privacy and storage
The comparison does not call any API nor load offers or documents. Data is deleted upon refresh or closing the page. The saved summary is a snapshot with your amounts, scope, exclusions, and explanations; review it before sharing. HTML is a standalone file without scripts or external content.
Next part of the same decision
Data on municipality, production, financing, and documents do not replace spatial or expert review of a specific property.